CAll Us: 020 8410 4600
CROYDON CCURV

CROYDON CCURV

Location: Croydon, UK

Client: – –

Contractor: Sir Robert McAlpine

Project Value: £1.1 Million

Completion: March 2011 – January 2013

System Installed: Trend Control Systems

Key Attributes:

  • 90 Fan Coil Units
  • 390 Chilled Beams
  • 10 MCCs Form 4
  • The system operates via Ethernet, ModBus and MBus.
  • High Level Interface
  • HV/LV Electrical Monitoring Interface
THE LANCASTERS

THE LANCASTERS

Location: Hyde Park, London

Client: – –

Contractor: Lorne Stewart

Project Value: £1.5 Million

Completion: – –

System Installed: Tridium / Omron Control Systems

Key Attributes: 

  • 2 MCCs Form 2
  • 8 Outstation Riser Panel
  • Circ 80 Apartments
  • This systems operates via Ethernet
  • High Level Interface to Crestron Systems & VRF Systems Daiken
  • Modbus Room Control
OLYMPIC MEDIA CENTRE

OLYMPIC MEDIA CENTRE

Location: Stratford, London

Client: – –

Contractor: Skanska / Carillion

Project Value: £2.4 Million

Completion: April 2010 – June 2011

System Installed: Trend Control Systems

Key Attributes: 

IBC Includes:

  • Localised Control panels for 58 off Studio AHU’s.
  • 3 Main Chilled Water Plants comprising of 19 Chillers to supplement Park District CHW system.
  • Distributed I/0, Electrical monitoring metering & generator monitoring over MODBUS Network over 5 floors of office FCU Controllers.

MPC Includes:

  • Localised Control panels for AHU, CHW and LTHW Distribution from Park District Systems
  • Distributed I/0 & Electrical metering over MODBUS networks.
    5 floors of Chilled Beam. FCU and Trench Heating Controls.
  • The BMS comprises a Copper & Fibre Ethernet backbone.
    MODBUS and IQ Networks are used for distributed control.
  • Network Interfaces are provided to link IBC, MPC and Supplementary buildings back to Head End BMS Supervisor.
  • Interface to Park wide Alarm System.
HERON TOWER

HERON TOWER

Location: Bishopsgate, London

Client: – –

Contractor: Skanska

Project Value: £2.5 Million

Completion: March 2009 – February 2011

System Installed: Trend Control Systems

Key Attributes:

  • Circa 1300 FCU’s
  • 37 MCCs Form 2
  • 12 ATS Panels
  • 10+ Outstation Panels
  • The system operates via Ethernet & LON
BBC BROADCASTING HOUSE

BBC BROADCASTING HOUSE

Location: Marylebone, London

Client: BBC

Contractor: Lend Lease

Project Value: £6.3 Million

Completion: November 2007 – January 2011

System Installed: Trend Control Systems

Key Attributes:

  • 2000 Chilled Beams
  • Smoke Damper Control System Fully integrated with ventilation systems
  • 84 MCCs Form 2 And Form 4 Type
  • System Resilience Afforded by
  • Dual/duplicated Controllers & Control Devices
  • Virtual Networks Provided with redundant links
  • Managed Network Switches
  • Additional dedicated Networks for essential Systems
  • Automatic transfer switches for essential MCCs & outstation Panels
OLYMPIC STADIUM

OLYMPIC STADIUM

Location: Stratford, London

Client: Olympic Delivery Authority

Contractor: Sir Robert McAlpine

Project Value: £1.1 Million

Completion: June 2009 – Jan 2011

System Installed: Trend Control Systems

Key Attributes:

  • Distributed MCCs serving localised Plantrooms.
  • LTHW & CHW distribution from Park District Systems
  • Supplementary Chillers controlled over ModBus Interface
  • Localised AHU & Misc Ventilation via BACnet
  • Unitary controllers
  • Electrical Metering and Monitoring
  • FCU & VRF Systems via ModBus & BACnet
  • Interface to Park wide Alarm System
HEATHROW T5 CIP LOUNGES

HEATHROW T5 CIP LOUNGES

Location: London, UK

Client: – –

Contractor: Mace MEP

Project Value: £1.5 Million

Completion: March 2009 – December 2010

System Installed: Trend Control Systems

Key Attributes:

  • 120+ Chilled Beams
  • 60+ Fan Coil Units
  • 9 MCCs Form 2
  • 6 AHU panelsThis system operates via Ethernet and Trend LAN
  • In addition Lloret Control Systems built more than 60 AHU panels for T5A
  • 130 MCCs, AHU panels
  • FCU panels for T5B and 5 panels for the Control Tower.
Bankside Buildings 123

Bankside Buildings 123

Location: Southwark, London

Client: – –

Contractor: Lendlease then Bovis / Land Securities

Project Value: £3.1 Million

Completion: – –

System Installed:  Trend Control Systems

Key Attributes:

  • 1000+ Fan Coil Units
  • 33 MCCs Form 4
  • 65 Outstation Panels
  • The system operates via Ethernet
  • High level ModBus Interface to carrier chillers
  • High level ModBus to contractor’s fire system
AMERICAN EXPRESS

AMERICAN EXPRESS

Location: Brighton, UK

Client: – –

Contractor: Sir Robert McAlpine

Project Value: £1.1 Million

Completion: – –

System Installed: Trend/Omron Control System with TOPS (Trend Open Protocol Server)

Key Attributes:

  • Circ 530 FCUs
  • Circ 20 Panels Form 2 and 3b
  • This systems operates via Ethernet
  • The BMS connects to the Building Services IP network via outlets provided adjacent to each control panel and BMS head end supervisor.
  • Buildings A and B are each provided with two IP networks:

1) For the building services including BMS, Emergency Lighting, Lighting, CM/EMS, CHP, Lifts and UPS (IBENS)

2) For the building’s data services including CCTV, access and security systems.

PARK HOUSE

PARK HOUSE

Location: Mayfair, London

Client: – –

Contractor: Mace MEP

Project Value: £1.2 Million

Completion: – –

System Installed: Tridium / Omron Control Systems

Key Attributes:

  • 12 MCCs Form 4
  • 20 Outstation Riser Panels
  • 450 Office FCUs
  • 45 Apartments
  • Hard Wired or high level to creston apartment automation system
  • Electrical monitoring systems