CROYDON CCURV
Location: Croydon, UK
Client: – –
Contractor: Sir Robert McAlpine
Project Value: £1.1 Million
Completion: March 2011 – January 2013
System Installed: Trend Control Systems
Key Attributes:
- 90 Fan Coil Units
- 390 Chilled Beams
- 10 MCCs Form 4
- The system operates via Ethernet, ModBus and MBus.
- High Level Interface
- HV/LV Electrical Monitoring Interface