PwC, 1 EMBANKMENT PLACE
Location: London, UK
Client: Price Waterhouse Coopers
Contractor: Overbury
Project Value: £3.5 Million
Completion: December 2011 – July 2013
System Installed: BMS = Trend / Omron Control System, Fire = Gent Managed Protocol
Key Attributes:
- Occupied Building
- 14 MCCs Form 2
- 18 SER Room Panels
- 36 POD MCC Panels
- 3 MER Room Panels
- 29 Fire Panels
- 2 Main Voice Alarm Racks
- 5000 Field devices
- Air Sampling