CAll Us: 020 8410 4600
RATHBONE PLACE

RATHBONE PLACE

Location: Central London

Client: Great Portland Estates

Contractor: Lend Lease

Project Value: £3.5 Million

Completion: December 2014 – November 2017

System Installed: Tridium / Distech Control Systems

Key Attributes:

  • Shell & Core
  • 25 MCPs
  • 21 MCCs
  • 19 OS Panels
  • 76 Landlords Fan Coil Units (FCUs)
  • 142 Apartments
  • System operates via BACnet TCIP, BACnet MSTP & ModBus
NOVA VICTORIA

NOVA VICTORIA

Location: Victoria, London

Client: Land Securities

Contractor: Mace MEP

Project Value: £8 Million

Completion: February 2014 – Ongoing

System Installed:  Tridium Control Systems

Key Attributes:

  • 50 Power Distribution Panels
  • 170 Control Enclosures
  • 1350 Fan Coil Units (FCUs)
  • 170 Apartments
BBC TELEVISION CENTRE

BBC TELEVISION CENTRE

Location: White City, London

Client: BBC

Contractor: Lend Lease

Project Value: £1 Million

Completion: – –

System Installed: BMS = Trend Control Systems, Fire = ADVANCED / Apollo XP95 Protocol

Key Attributes:

  • Refurbishment of highly intelligent Television Studios 1, 2 & 3
  • New Motor Control Centres
  • Fast Track Programme
DE VERE GARDENS

DE VERE GARDENS

Location: Kensington, London

Client: – –

Contractor: Sir Robert McAlpine

Project Value: £3.5 Million

Completion: June 2013 – March 2015

System Installed: BMS = Trend Control Systems, Fire = ADVANCED / Hochiki Protocol

Key Attributes: 

  • 6 MCCs Form 2
  • 13 Outstationss
  • 93 Fan Coil Units for Ancillary Areas
  • 97 Apartments a mixture of 1 – 5 bedrooms
  • The system operates via Ethernet, Modbus, Mbus and BACnet.
  • Monitoring of 200 Energy Meters
  • Monitoring of 300 Gas/Water/Electrical Meters
  • L1 Category Fire Alarm Detection
  • Aspirating System
  • Fire Telephone / Disabled Refuge System
20 FENCHURCH STREET

20 FENCHURCH STREET

Location: London, UK

Client: – –

Contractor: Michael Lonsdale Group

Project Value: £1.2 Million

Completion: 2014

System Installed: Tridium Control Systems

Key Attributes:

  • Fast track Fit Out of 9 floors for three different tenants
  • The Fit Out installations were integrated with an existing third party landlord system utilising BACnet
NEWS CORP

NEWS CORP

Location: London Bridge, UK

Client: News UK

Contractor: ISG Plc

Project Value: £1.6 Million

Completion: 2014

System Installed: Distech Control Systems

Key Attributes: 

  • 50 Control Enclosures
  • 1600 Fan Coil Units (FCUs)
PwC, 1 EMBANKMENT PLACE

PwC, 1 EMBANKMENT PLACE

Location: London, UK

Client: Price Waterhouse Coopers

Contractor: Overbury

Project Value: £3.5 Million

Completion: December 2011 – July 2013

System Installed: BMS = Trend / Omron Control System, Fire = Gent Managed Protocol

Key Attributes: 

  • Occupied Building
  • 14 MCCs Form 2
  • 18 SER Room Panels
  • 36 POD MCC Panels
  • 3 MER Room Panels
  • 29 Fire Panels
  • 2 Main Voice Alarm Racks
  • 5000 Field devices
  • Air Sampling
CROYDON CCURV

CROYDON CCURV

Location: Croydon, UK

Client: – –

Contractor: Sir Robert McAlpine

Project Value: £1.1 Million

Completion: March 2011 – January 2013

System Installed: Trend Control Systems

Key Attributes:

  • 90 Fan Coil Units
  • 390 Chilled Beams
  • 10 MCCs Form 4
  • The system operates via Ethernet, ModBus and MBus.
  • High Level Interface
  • HV/LV Electrical Monitoring Interface
THE LANCASTERS

THE LANCASTERS

Location: Hyde Park, London

Client: – –

Contractor: Lorne Stewart

Project Value: £1.5 Million

Completion: – –

System Installed: Tridium / Omron Control Systems

Key Attributes: 

  • 2 MCCs Form 2
  • 8 Outstation Riser Panel
  • Circ 80 Apartments
  • This systems operates via Ethernet
  • High Level Interface to Crestron Systems & VRF Systems Daiken
  • Modbus Room Control
OLYMPIC MEDIA CENTRE

OLYMPIC MEDIA CENTRE

Location: Stratford, London

Client: – –

Contractor: Skanska / Carillion

Project Value: £2.4 Million

Completion: April 2010 – June 2011

System Installed: Trend Control Systems

Key Attributes: 

IBC Includes:

  • Localised Control panels for 58 off Studio AHU’s.
  • 3 Main Chilled Water Plants comprising of 19 Chillers to supplement Park District CHW system.
  • Distributed I/0, Electrical monitoring metering & generator monitoring over MODBUS Network over 5 floors of office FCU Controllers.

MPC Includes:

  • Localised Control panels for AHU, CHW and LTHW Distribution from Park District Systems
  • Distributed I/0 & Electrical metering over MODBUS networks.
    5 floors of Chilled Beam. FCU and Trench Heating Controls.
  • The BMS comprises a Copper & Fibre Ethernet backbone.
    MODBUS and IQ Networks are used for distributed control.
  • Network Interfaces are provided to link IBC, MPC and Supplementary buildings back to Head End BMS Supervisor.
  • Interface to Park wide Alarm System.