HEATHROW T5 CIP LOUNGES

HEATHROW T5 CIP LOUNGES

Location: London, UK

Client: – –

Contractor: Mace MEP

Project Value: £1.5 Million

Completion: March 2009 – December 2010

System Installed: Trend Control Systems

Key Attributes:

  • 120+ Chilled Beams
  • 60+ Fan Coil Units
  • 9 MCCs Form 2
  • 6 AHU panelsThis system operates via Ethernet and Trend LAN
  • In addition Lloret Control Systems built more than 60 AHU panels for T5A
  • 130 MCCs, AHU panels
  • FCU panels for T5B and 5 panels for the Control Tower.