HEATHROW T5 CIP LOUNGES
Location: London, UK
Client: – –
Contractor: Mace MEP
Project Value: £1.5 Million
Completion: March 2009 – December 2010
System Installed: Trend Control Systems
Key Attributes:
- 120+ Chilled Beams
- 60+ Fan Coil Units
- 9 MCCs Form 2
- 6 AHU panelsThis system operates via Ethernet and Trend LAN
- In addition Lloret Control Systems built more than 60 AHU panels for T5A
- 130 MCCs, AHU panels
- FCU panels for T5B and 5 panels for the Control Tower.