CAll Us: 020 8410 4600
HAYS GALLERIA

HAYS GALLERIA

Location: London, UK

Client: – –

Contractor: Overbury

Project Value: £500,000

Completion: September 2013 – April 2014

System Installed: Gent Managed Protocol

Key Attributes:

  • Upgrade Gent System to accommodate refurbishment plans
  • 4 Gent Vigilon Panels added
  • Repeater Panels in each of the three Reception areas
  • 500 Gent S-Quad Detection and Alarm Devices
  • Upgrade of VAV & AHU system in partnership with Lloret Maintenance
About the Author

Leave a Reply